So, this is my first "official" job. Please dont hold off the criticisms you have, it's how I can improve myself.
Total time was about 5 and 1/2 hours (the owner had to be somewhere with his wife), GG6 + Prima swirl + LC orange pad was used on the entire car.
Before

In garage halogen shot (Left side was done, right side still needed to be worked on)

Reflection shot off the trunk

Picture outside

Beading action


Outside in the sun., excuse the dirty looking pictures. We took it outside the customer's townhouse where construction were going on.



Another reflection shot here

Didnt take a lot of before pictures because I was in my own little world lol.
Total time was about 5 and 1/2 hours (the owner had to be somewhere with his wife), GG6 + Prima swirl + LC orange pad was used on the entire car.
Before

In garage halogen shot (Left side was done, right side still needed to be worked on)

Reflection shot off the trunk

Picture outside

Beading action


Outside in the sun., excuse the dirty looking pictures. We took it outside the customer's townhouse where construction were going on.



Another reflection shot here

Didnt take a lot of before pictures because I was in my own little world lol.