Harley Davidson Sportster

DP 08 GXP

New member
Joined
Jul 14, 2012
Messages
314
Reaction score
0
If it has paint and chrome I can detail that too. My cousin brought me over his Harley Davidson Sportster to detail. Process was a strip wash with Chemical Guys Citrus Wash and Gloss. I used various size brushes to clean the rims and engine bay with Megs Super Degreaser. The rims got Poorboys Spray and Rinse. Clayed with Speedy Prep fine grade towel. Polished with PC on a orange 4" pad with Menzerna PF-2500. Engine was polished with Adam's #1 and #2 metal polishes. It was dressed with Megs Plastic and Vinyl Spray. Bags were treated with Adams Leather Conditioner. It was waxed with Pinnacle Souveran paste wax. I think that was it. On with the pics.

Before
P1040503_zpsb171b619.jpg

P1040504_zps33825cd1.jpg

P1040505_zps4d1a22dd.jpg

P1040506_zps435efaf5.jpg

P1040507_zpsd6c7d763.jpg

P1040508_zpse186d774.jpg

P1040509_zps5bf69cf6.jpg

P1040510_zpsa1539e73.jpg

P1040511_zpsad1097ab.jpg

P1040512_zps60d562ed.jpg

P1040513_zps4bb528dd.jpg

P1040514_zps537ab01d.jpg

P1040515_zps4798abb3.jpg

P1040516_zps09a9dc20.jpg

P1040517_zps69400cbf.jpg


After
P1040518_zpsf174f758.jpg

P1040519_zps43bb5d08.jpg

P1040520_zpse68c8b9b.jpg

P1040521_zpsfdefa41e.jpg

P1040522_zpsa2925d3d.jpg

P1040523_zps456220d5.jpg

P1040524_zpsd7618983.jpg

P1040525_zpsd4b4b9bf.jpg

P1040526_zpsdc5c8c21.jpg

P1040527_zpsc2cf53b9.jpg

P1040528_zpsae0543a9.jpg

P1040529_zpscc53a6e9.jpg

P1040530_zps27950381.jpg

P1040531_zps40fd49c2.jpg

P1040532_zpsd80cf201.jpg
 
Nice turn around. Just curious how long did it take you to complete the motorcycle fom start to finish? Even though they are small they sometimes take as long as a compact car.
 
Great job :). I love doing motorcycles :)

Thanks!

Nice turn around. Just curious how long did it take you to complete the motorcycle fom start to finish? Even though they are small they sometimes take as long as a compact car.

Thanks! It was about 4 hours. I could have done a lot more but he was only paying for that amount of work to be done in that time frame.
 
Back
Top