Driwash
New member
- Aug 3, 2011
- 240
- 0
Here is the repair costs so far. The targo top and rear window have to be replaced aslo. But the good part is that it will all be new and I should have it back Wed. or Thurs. next week. They are going to remove and paint the rear of the vette. Very happy about that.
The Body shop manager is a vette owner also. He told me it would be done right.
I told them I did not want to see any orange peel. They told me it would have about 6 mills of top grade clear and look like glass.
Tom
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
1 ROOF
2* RPR REAR PANEL 1.0* 1.5
3 ADD FOR CLEAR COAT 0.6
4 R&I RT ROOF MOLDING 0.3
5 R&I LT ROOF MOLDING 0.3
6 REAR BUMPER
7* RPR BUMPER COVER 1.0* 3.4
8 ADD FOR CLEAR COAT 1.4
9 O/H BUMPER ASSY 4.7
1
11/11/2011 AT 02:45 PM 0193354140101021-01
106288 2A0G01VV
ESTIMATE OF RECORD
1997 CHEV CORVETTE 8-5.7L-FI 2D CPE RED INT:
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
10 QUARTER PANEL
11* RPR RT QUARTER PANEL COUPE 0.5* 1.6
12 OVERLAP MAJOR NON-ADJ. PANEL -0.2
13 ADD FOR CLEAR COAT 0.3
14 REAR LAMPS
15 R&I RT SIDE MARKER LAMP 0.3
16 DOOR
17* RPR RT OUTER PANEL 0.5* 2.1
18 OVERLAP MAJOR ADJ. PANEL -0.4
19 ADD FOR CLEAR COAT 0.3
20* R&I RT BODY SIDE MLDG 0.5*
21 R&I RT MIRROR OUTSIDE W/O MEMORY 0.7
22 R&I RT R&I TRIM PANEL 0.5
23 R&I RT HANDLE, OUTSIDE PAINT TO 0.5
MATCH
24 LIFT GLASS
25* RPR LIFT GATE 1.0* 1.5
26 OVERLAP MAJOR ADJ. PANEL -0.4
27 ADD FOR CLEAR COAT 0.2
28# REFN COLOR TINT AND BLEND 1.0
29 REPL EMBLEM 1 57.64 0.2
N 30# REPL LIFTGATE GLASS +20% 1 804.00 INCL.*
N 31# REPL TOP GLASS +20% 1 1920.00 INCL.*
32# REPL TINT GLASS +20% 1 54.00
33 OTHER CHARGES
34# E.P.C. 1 2.50
-------------------------------------------------------------------------------
SUBTOTALS ==> 2838.14 12.0 12.9
LINE 30 : TIM AT PRECISION
LINE 31 : TIM AT PRECISION
-------------------------------------------------------------------------------
ESTIMATE NOTES:
PAYMENT REQ EFT- IP- 01
PAY CODE 8
CC 01
POL 4155846993
DI
DM 63-
AM
LKQ
TOW
COP
RN Y
2
11/11/2011 AT 02:45 PM 0193354140101021-01
106288 2A0G01VV
ESTIMATE OF RECORD
1997 CHEV CORVETTE 8-5.7L-FI 2D CPE RED INT:
-------------------------------------------------------------------------------
PRIOR DAMAGE NOTES:
NONE
PARTS 2835.64
PARTS DISCOUNT $ 57.64 -10.0% -5.76
BODY LABOR 12.0 HRS @$ 40.00/HR 480.00
PAINT LABOR 12.9 HRS @$ 40.00/HR 516.00
PAINT SUPPLIES 12.9 HRS @$ 22.00/HR 283.80
OTHER CHARGES 2.50
----------------------------------------------------
SUBTOTAL $ 4112.18
SALES TAX TIER 1 $ 4109.68 @ 6.5000% 267.13
----------------------------------------------------
TOTAL COST OF REPAIRS $ 4379.31
The Body shop manager is a vette owner also. He told me it would be done right.
I told them I did not want to see any orange peel. They told me it would have about 6 mills of top grade clear and look like glass.
Tom
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
1 ROOF
2* RPR REAR PANEL 1.0* 1.5
3 ADD FOR CLEAR COAT 0.6
4 R&I RT ROOF MOLDING 0.3
5 R&I LT ROOF MOLDING 0.3
6 REAR BUMPER
7* RPR BUMPER COVER 1.0* 3.4
8 ADD FOR CLEAR COAT 1.4
9 O/H BUMPER ASSY 4.7
1
11/11/2011 AT 02:45 PM 0193354140101021-01
106288 2A0G01VV
ESTIMATE OF RECORD
1997 CHEV CORVETTE 8-5.7L-FI 2D CPE RED INT:
-------------------------------------------------------------------------------
NO. OP. DESCRIPTION QTY EXT. PRICE LABOR PAINT
-------------------------------------------------------------------------------
10 QUARTER PANEL
11* RPR RT QUARTER PANEL COUPE 0.5* 1.6
12 OVERLAP MAJOR NON-ADJ. PANEL -0.2
13 ADD FOR CLEAR COAT 0.3
14 REAR LAMPS
15 R&I RT SIDE MARKER LAMP 0.3
16 DOOR
17* RPR RT OUTER PANEL 0.5* 2.1
18 OVERLAP MAJOR ADJ. PANEL -0.4
19 ADD FOR CLEAR COAT 0.3
20* R&I RT BODY SIDE MLDG 0.5*
21 R&I RT MIRROR OUTSIDE W/O MEMORY 0.7
22 R&I RT R&I TRIM PANEL 0.5
23 R&I RT HANDLE, OUTSIDE PAINT TO 0.5
MATCH
24 LIFT GLASS
25* RPR LIFT GATE 1.0* 1.5
26 OVERLAP MAJOR ADJ. PANEL -0.4
27 ADD FOR CLEAR COAT 0.2
28# REFN COLOR TINT AND BLEND 1.0
29 REPL EMBLEM 1 57.64 0.2
N 30# REPL LIFTGATE GLASS +20% 1 804.00 INCL.*
N 31# REPL TOP GLASS +20% 1 1920.00 INCL.*
32# REPL TINT GLASS +20% 1 54.00
33 OTHER CHARGES
34# E.P.C. 1 2.50
-------------------------------------------------------------------------------
SUBTOTALS ==> 2838.14 12.0 12.9
LINE 30 : TIM AT PRECISION
LINE 31 : TIM AT PRECISION
-------------------------------------------------------------------------------
ESTIMATE NOTES:
PAYMENT REQ EFT- IP- 01
PAY CODE 8
CC 01
POL 4155846993
DI
DM 63-
AM
LKQ
TOW
COP
RN Y
2
11/11/2011 AT 02:45 PM 0193354140101021-01
106288 2A0G01VV
ESTIMATE OF RECORD
1997 CHEV CORVETTE 8-5.7L-FI 2D CPE RED INT:
-------------------------------------------------------------------------------
PRIOR DAMAGE NOTES:
NONE
PARTS 2835.64
PARTS DISCOUNT $ 57.64 -10.0% -5.76
BODY LABOR 12.0 HRS @$ 40.00/HR 480.00
PAINT LABOR 12.9 HRS @$ 40.00/HR 516.00
PAINT SUPPLIES 12.9 HRS @$ 22.00/HR 283.80
OTHER CHARGES 2.50
----------------------------------------------------
SUBTOTAL $ 4112.18
SALES TAX TIER 1 $ 4109.68 @ 6.5000% 267.13
----------------------------------------------------
TOTAL COST OF REPAIRS $ 4379.31