Mike Phillips
Active member
- Dec 5, 2022
- 51,004
- 6
2-3 guys needed - Pontoon Boat Project - Tomorrow! (Wednesday)
Start time is 8:00am, Wednesday May 20th
For all our regular Thursday night guys as I mentioned last week during the Bayliner wetsanding project, I might have a Pontoon boat here next week.
Well it's next week.
I knocked out one side but the other side still needs an extreme makeover. I did a lot of tool, pad and product testing and dialed-in a system that makes restoring neglected and oxidized aluminum Bubba-proof with just about any tool.
The other side still needs to be machine sanded and buffed. I'm going to start at 8:00am and work till she's finished.
My guess is by myself I can knock this project out in about 5 to 6 hours. With a 2 to 3 guys helping I think we can knock it out in 3 hours max.
Note: Buffing out aluminum a lot more work than buffing out a car so keep that in mind when volunteering. I've dialed-in a process that takes a LOT of the labor out of this type of work but still, you're going to be sanding and buffing.
If you want to be a part of this project please reply to this thread or shoot me an e-mail.
[email protected]
I'll be in the garage at 8:00am for anyone that wants to join in the fun...
Here's the before shot....
This my friends are what I call test spots....
This side is ready for the Sandbar!
Before
After
So it's just the other side of this Pontoon boat we have to tackle and with the system I've dialed-in it will go pretty fast.
Do wear work clothes as you tend to get dirty when sanding and buffing aluminum.
:xyxthumbs:
Start time is 8:00am, Wednesday May 20th
For all our regular Thursday night guys as I mentioned last week during the Bayliner wetsanding project, I might have a Pontoon boat here next week.
Well it's next week.

I knocked out one side but the other side still needs an extreme makeover. I did a lot of tool, pad and product testing and dialed-in a system that makes restoring neglected and oxidized aluminum Bubba-proof with just about any tool.
The other side still needs to be machine sanded and buffed. I'm going to start at 8:00am and work till she's finished.
My guess is by myself I can knock this project out in about 5 to 6 hours. With a 2 to 3 guys helping I think we can knock it out in 3 hours max.
Note: Buffing out aluminum a lot more work than buffing out a car so keep that in mind when volunteering. I've dialed-in a process that takes a LOT of the labor out of this type of work but still, you're going to be sanding and buffing.
If you want to be a part of this project please reply to this thread or shoot me an e-mail.
[email protected]
I'll be in the garage at 8:00am for anyone that wants to join in the fun...
Here's the before shot....

This my friends are what I call test spots....

This side is ready for the Sandbar!

Before

After

So it's just the other side of this Pontoon boat we have to tackle and with the system I've dialed-in it will go pretty fast.
Do wear work clothes as you tend to get dirty when sanding and buffing aluminum.
:xyxthumbs: