Cosmin
Member
- Oct 31, 2009
- 742
- 0
i haven`t post here for a while , been busy , this pic are with the cellphone.
working time 2.30min -3h , one person.
the whole car was done in the straight texas sun , a bit pass noon , onr wax and claybar, tape than flex da with light cutting pad and mezerna sip , polish with da polish pad and meg 205, one more onr wash.
the car condition at my arrival:
AFTER:
working time 2.30min -3h , one person.
the whole car was done in the straight texas sun , a bit pass noon , onr wax and claybar, tape than flex da with light cutting pad and mezerna sip , polish with da polish pad and meg 205, one more onr wash.
the car condition at my arrival:



AFTER:



:buffing: :dblthumb2: