courtdale
New member
- Aug 25, 2011
- 427
- 0
I've read all of the above referenced in regards to correction. Some have said 5 minutes per section, i've heard 3 complete passes, and i've heard working product until it is visibly breakign down.
First time out, I want to say I followed the product breakdown protocal, but I probably stopped short of that and was weak on pressure as well as rotary speed to err on the side of caution.
What should i be using as a timer in best practice, and what speed should i be topping out at on a Makita assuming i dont buff like a baby again. (i use the pyramid method on the speeds but i never went past 3 on the dial).
First time out, I want to say I followed the product breakdown protocal, but I probably stopped short of that and was weak on pressure as well as rotary speed to err on the side of caution.
What should i be using as a timer in best practice, and what speed should i be topping out at on a Makita assuming i dont buff like a baby again. (i use the pyramid method on the speeds but i never went past 3 on the dial).