i think that i am doing something wrong in term of my timing and quality\quantity of my labour for a day and i will explain ( with my bad English (-: ).
usually a daily detailing job for me is something like 10-14 hours including preparing taping and clay (straight )-deepens on the size of the car and the LSP (coating or a simple sealant ).
in those 10-14 hours i am doing 1-2 polishing steps max.
most of my Colleague claim that they can do one step in 4 hours and 2 steps in 6-7 hours and so.
i know from a fact that i am using a better gear and products then the most of them,i am using FLEX 3401 as a machine,"scholl concepts" s20,A15',S30,"menzerna" FG400,SF4000, "RUPES UHS" AND a very quality pads from scholl concepts,LC and menzerna.
in general i am tending to work on a long steps\working cycle per PANEL and i am NOT wasting any time,i am working like a machine with no rest at all.
99% of my Reviews are excellent (I'm doing it for a living) but i feel Frustrated because i am sure that i can do so much more in 10-14 hours,not mention the pain after 14 hours labour.
i don't have my own place whats makes 2-3 days to work on a car just not worth Economic.
any ideas about something wrong that i am doing about my "rhythm" quality\quantity ?
is that the time to switch to a rotary machine ?
usually a daily detailing job for me is something like 10-14 hours including preparing taping and clay (straight )-deepens on the size of the car and the LSP (coating or a simple sealant ).
in those 10-14 hours i am doing 1-2 polishing steps max.
most of my Colleague claim that they can do one step in 4 hours and 2 steps in 6-7 hours and so.
i know from a fact that i am using a better gear and products then the most of them,i am using FLEX 3401 as a machine,"scholl concepts" s20,A15',S30,"menzerna" FG400,SF4000, "RUPES UHS" AND a very quality pads from scholl concepts,LC and menzerna.
in general i am tending to work on a long steps\working cycle per PANEL and i am NOT wasting any time,i am working like a machine with no rest at all.
99% of my Reviews are excellent (I'm doing it for a living) but i feel Frustrated because i am sure that i can do so much more in 10-14 hours,not mention the pain after 14 hours labour.
i don't have my own place whats makes 2-3 days to work on a car just not worth Economic.
any ideas about something wrong that i am doing about my "rhythm" quality\quantity ?
is that the time to switch to a rotary machine ?