Sometimes there just doesn't seem to be enough time to do everything I want to do the day I start a project i.e. my personal vehicle. It's probably a mix of old age (mine) and OCD, but too many times I find myself having to cut something short and say "I'll do that first, next time". When I clean I tend to obsess and spend way too much time on 1 area. If I was to be a little more structured I know I could knock it all out in 1 day, but that's just not me.
I'd really like to resume the following day but I find myself thinking about all the dust and debris that fell on the paint while the car was sitting in the garage overnight and worry about jumping right back in where I left off.
What would you suggest and how do you tackle a 2 day job? I was thinking that I should attack the paint first and then move onto the widows and other exterior crevices the following day followed up by the interior wipe down and wheel dressing? But what if I'm not able to complete my wax/cleaner process in 1 day? Is it ok to wipe down the exterior with a damp MF towel and resume where I left off?
I'd really like to resume the following day but I find myself thinking about all the dust and debris that fell on the paint while the car was sitting in the garage overnight and worry about jumping right back in where I left off.
What would you suggest and how do you tackle a 2 day job? I was thinking that I should attack the paint first and then move onto the widows and other exterior crevices the following day followed up by the interior wipe down and wheel dressing? But what if I'm not able to complete my wax/cleaner process in 1 day? Is it ok to wipe down the exterior with a damp MF towel and resume where I left off?