KJW Detailing
New member
- Mar 20, 2007
- 666
- 0
Im wondering how long it takes you do do a full detail (inside and out)...but more of a focus on the exterior...
so how long would it take you if your used XMT 360 and then a coat of wax, along with the prep work (ie. wheel cleaning, claying, cleaning the car)
now long would it take if your doing a 2 stage paint correction, then a glaze, then a wax?
im just trying to determine how long it would take to do a full detail...i know at work i can get through an interior in about 1 1/2 - 2 hrs...and it takes about 2 hrs for the exterior but this is a one step paint correction then wax (this is about all the time they give us)...
so how long do you think it will take using the PC?
thanks!
so how long would it take you if your used XMT 360 and then a coat of wax, along with the prep work (ie. wheel cleaning, claying, cleaning the car)
now long would it take if your doing a 2 stage paint correction, then a glaze, then a wax?
im just trying to determine how long it would take to do a full detail...i know at work i can get through an interior in about 1 1/2 - 2 hrs...and it takes about 2 hrs for the exterior but this is a one step paint correction then wax (this is about all the time they give us)...
so how long do you think it will take using the PC?
thanks!